Understanding Rear 200 Preconnect
Let's dive into the details surrounding Rear 200 Preconnect. Rear 200' preconnect
Key Takeaways about Rear 200 Preconnect
- Objective: Deploy 1.75”
- The front, #1 and middle, #2 crosslay on ET7 are both 200ft. #1 is yellow, it has a fog nozzle and is pulled from the officer side.
- As part of the Training Minutes video series - Hoseline management considerations for the
- preconnect
- 2.5” rear preconnect
Detailed Analysis of Rear 200 Preconnect
400 extended lay from 250' rear preconnect and 150' crosslay This video will walk you through the proper way to deploy and reload the 2-1/2" This video details how to load the RVFD
Stretching the 250' 2.5"
That wraps up our extensive overview of Rear 200 Preconnect.